How should you plan stainless steel cabinets?

This guide helps buyers plan custom 304 stainless steel cabinetry from measured drawings through finish approval, delivery planning, and local installation responsibilities.

Key takeaways

  • Start with measured room and appliance drawings.
  • Separate cabinet body, finish, doors, worktops, and fittings in the quote.
  • Keep production, freight, customs, and installation responsibilities distinct.
  • Ask a licensed customs broker to verify destination duty.
  • Use a dated drawing revision and written inspection terms before approval.

Full transcript

0:00What should you define before requesting a quote?

Begin with a measured room drawing, an appliance list, and a written scope that separates cabinet bodies, doors, worktops, fittings, options, and service cutouts so every line-by-line 304 stainless steel cabinet quote can be compared fairly before approval.

1:03Which material and finish details matter?

Fadior cabinet bodies use 304 stainless steel, with powder-coat, wood-grain, metallic, and textured finish directions confirmed by approved samples. Fadior finishes are cured at 220°C in our factory, so record each approved sample beside its supplier reference and dated drawing revision.

1:57How should daily use and site trades shape the plan?

Plan appliance openings, service connections, drawers, tall storage, and the island together. Bring room, appliance, finish, and destination references to a consultation or a Chencun showroom appointment, then have a local installer confirm dimensions, access, and connections before delivery.

2:49How do lead time, shipping, and US duty fit?

Standard factory production takes 45–60 days after deposit and drawing sign-off, while packing, ocean shipping, customs, delivery, and local installation stay separate. US imports of metal and stainless steel cabinetry may face Section 232 steel derivative duties and stacked trade tariffs that have changed several times in 2026, so have a licensed US customs broker confirm your current 10-digit HTSUS code and landed duty before you order.

3:51Who should skip custom stainless steel cabinets?

Skip this guide when you need an immediate replacement without measured drawings or a written process, or when dimensions and installation responsibilities remain unresolved. Buyers who bring a measured plan, appliance list, finish references, destination, and written approval terms are ready for an itemized consultation under the 30-year cabinet-body structural warranty.