Video buyer guide4:236 chapters

How Should You Plan Stainless Steel Kitchen Cabinets?

Plan 304 stainless cabinets cleanly.

Key takeaways

  • Measure rooms and appliances.
  • Separate fronts, tops, freight.
  • Confirm US Section 232 duties with a broker.
  • Confirm local trades first.

Full transcript

0:00What should you verify first?

Start with measured plans, appliances, and itemized scope lines.

Record missing scope as written exclusions and keep islands, tall units, drawers, and service cutouts on the same drawing so quotations stay comparable.

0:36How should the room be measured?

Log exposure, layout, samples, and appliance openings together.

Fadior cabinet bodies use glue-free 304 stainless steel while doors, decorative fronts, and worktops are specified separately before any deposit is released.

1:26Which details define daily use?

Lock drawers, trap space, and seamless welded 304 sink details.

A seamless integrated sink welds a 304 stainless steel bowl into a 304 worktop with a burr-free perimeter, directional drainage slope, and under-sink clearance.

2:12How do finish and production connect?

Production takes 45–60 days after deposit; view real samples.

Fadior operates an 80,000+ square metre smart factory with 5 production lines, so confirm written inspection checkpoints and keep shipping separate from factory lead time.

2:57What should delivery planning include?

Separate ocean freight, customs brokerage, local installation trades, and US Section 232 duty checks.

US imports of metal and stainless steel cabinetry may face Section 232 steel derivative duties and stacked trade tariffs that have changed several times in 2026, so have a licensed US customs broker confirm your current 10-digit HTSUS code and landed duty before you order.

3:44Who should skip stainless steel cabinets?

Skip custom stainless cabinets for rush swaps or unmeasured rooms.

Made-to-order cabinetry requires measured room dimensions, an agreed written scope, verified landed duty and freight budgets, and confirmed local installation responsibility before any deposit.