Vietnam · Factory-direct cabinetry

304 stainless steel cabinetry for Vietnam

Fadior is a Foshan manufacturer of food-grade 304 stainless cabinet bodies for Ho Chi Minh City, Hanoi and Da Nang, where tropical rain, coastal humidity and termite pressure shape kitchens, wardrobes, vanities and outdoor kitchens.

Reviewed by · Updated
smart factory campus in Foshan
80,000+ m²
stainless cabinet-body standard
304
standard Foshan production
45–60 days
Completed Fadior bright white L-shaped 304 stainless steel kitchen with stone-look worktops and integrated appliances used as a humid coastal reference
A photographed completed Fadior white L-shaped 304 stainless steel kitchen used as a humid coastal residential reference.

Verified specification

Vietnam project facts

Supply route
Direct Foshan export
Factory-packed cabinet package; local site team fits on arrival
Cabinet body
304 stainless steel
ASTM A240 / EN 1.4301 · 0.6 mm door panels · 1.2 mm countertop substrates
Standard production
45–60 days
After deposit and drawing sign-off; custom profiles 75–90 days
Climate exposure
Humid, tropical air
No timber-based board in the body; seals and ventilation stay site tasks
Structural warranty
30 years
Cabinet body; specific terms are subject to the contract
A commercial cabinetry partner for Vietnam

A measured factory package for humid coastal villas and apartments

Ho Chi Minh City, Hanoi and Da Nang bring tropical rain, coastal humidity and termite pressure into daily cabinet decisions. A food-grade 304 stainless body gives the cabinetry package a stable, cleanable base when moisture reaches an edge. That material statement is limited to the tested cabinet-body base sheet. Doors, finishes, worktops, appliances, seals, ventilation and plumbing interfaces need their own specifications and local checks.

The brief can connect kitchens, wardrobes, vanities and outdoor kitchens under one finish schedule while keeping access, ventilation, drainage and appliance clearances visible. Fadior reviews room dimensions, elevations, service points and finish samples in Foshan. The local designer, builder or licensed trade confirms site conditions, building rules, receiving access and final handover.

Factory-direct supply is a defined cabinetry scope. Fadior coordinates drawings, the bill of materials, labels and export packing before production. The importer and customs broker handle entry documents. Local trades complete services, waterproofing, ventilation, appliance commissioning and site tolerances under their own contracts.

For a homeowner, designer or developer in Vietnam, the value is a room-by-room schedule that carries one material language from the kitchen into wardrobes, vanities, laundry and sheltered outdoor areas. Every decision names who measures, approves drawings, manages import entry, receives the goods and signs off local work.

01 · Kitchens

Tropical kitchen systems

Coordinate 304 stainless cabinet bodies for kitchens, wardrobes, vanities and outdoor kitchens, with appliance openings, ventilation notes, drawer logic and a finish schedule.

02 · Residences

Villas, apartments and penthouses

Develop room-by-room cabinetry for Ho Chi Minh City, Hanoi and Da Nang, with lift access, corridor turns, drainage and building constraints checked before production.

03 · Storage

Wardrobes, vanities and laundry

Carry one residential material story into dressing rooms, bathroom vanities, utility rooms and storage while each component keeps its own specification.

04 · Outdoor

Sheltered outdoor kitchens

Plan outdoor cabinetry around roof cover, rainfall, salt exposure, ventilation and maintenance. The local team confirms actual conditions in Vietnam.

Verified product and factory facts

Engineering details for a Vietnam brief

Use documented specifications to compare a factory package, coordinate local trades and set a realistic import conversation.

Material
Food-grade 304 stainless cabinet body
The food-grade wording applies to the tested 304 stainless cabinet-body base sheet. Doors, glass, mirrors, sintered stone, worktops, appliances and installation materials follow their own specifications.
Panel gauges
0.6 mm doors and 1.2 mm countertop substrates
Standard sheet-metal door panels are 0.6 mm and countertop substrates are 1.2 mm. Stone surfaces and specialty faces keep separate material documents.
Body construction
One-piece seamless Salvagnini bending
Automated bending forms the 304 stainless cabinet body as a precise one-piece construction. The glue-free cabinet body is formaldehyde-free, while doors, finishes and countertops follow their own documents.
Finishes
80+ colours and architectural textures
Powder-coat colours, PVD bronze, champagne gold and rose gold, wood-grain transfer, linen embossing and anti-fingerprint textures support residential and coastal briefs.
Hardware
Blum Austria, 200,000+ cycles
Blum soft-close hinges and drawer systems are rated for more than 200,000 open-close cycles. Countertop damping strips and service clearances remain part of the approved design.
Factory scale
80,000+ sqm and 200,000+ units yearly
The Foshan Industry 4.0 factory uses MES and AGV systems, carries ISO 9001 and co-drafted QB/T 5973-2024. Capacity supports one home or a repeatable developer schedule.
Programme
45–60 days standard production
Standard production starts after drawing sign-off and a 60% deposit. Custom profiles, special finishes and large runs take longer by quotation, followed by separate ocean transit and customs planning.
Compare the delivery models

Where a Foshan factory package fits in Vietnam

Compare like with like by separating the factory cabinetry scope from local design, import and trade responsibilities.

Cabinet body

Fadior factory scope
Food-grade 304 stainless body engineered to the approved room schedule.
Vietnam local scope
Local material, fabrication or assembly under the local quotation.

Design coordination

Fadior factory scope
Metric drawings, appliance openings, hardware schedule and finish confirmation.
Vietnam local scope
Site measure, services, building coordination and final trade drawings.

Humidity context

Fadior factory scope
Steel body selected for defined humid conditions; components keep their own specifications.
Vietnam local scope
Local team confirms waterproofing, seals, ventilation, drainage and maintenance.

Building access

Fadior factory scope
Labelled packing and module clearances planned to the agreed route.
Vietnam local scope
Lift, corridor, loading bay, fire door and receiving windows checked on site.

Import entry

Fadior factory scope
Commercial invoice, packing information and shipment assumptions for the importer.
Vietnam local scope
Importer and broker manage permits, duties, inspection and final delivery.

Services

Fadior factory scope
Cabinet openings and interfaces coordinated from approved information.
Vietnam local scope
Licensed local trades complete electrical, water, ventilation and site compliance work.

Coverage boundary

Fadior factory scope
Cabinet-body structural coverage is 30 years subject to contract terms.
Vietnam local scope
Local workmanship, appliances, services and site conditions follow local contracts.

Fadior supplies an engineered cabinetry package from Foshan. It does not promise Vietnam site measurement, customs clearance, electrical or plumbing work, building approval or local trade handover.

Designed around Vietnam handover points

Four checks for a usable Vietnam package

Resolve climate, access, services and responsibility boundaries before a deposit and drawing release.

01 · Moisture

A stable body for wet and dry zones

High humidity, rain, air-conditioning cycles and cleaning can expose weak board edges in humid coastal villas and apartments. A 304 stainless cabinet body avoids timber-board swelling in that part of the package. Seals, ventilation, worktops and drainage remain design tasks.

02 · Access

Measure the route, not only the room

Record lift-car dimensions, door widths, corridor turns, loading bays and receiving windows in millimetres. Fadior labels and packs modules to the agreed schedule; the local team confirms the route before production.

03 · Services

Coordinate utilities before release

Confirm appliance openings, water points, drainage, ventilation, electrical work, waterproofing and maintenance access with the licensed local trades. Cabinet drawings cannot replace local approvals.

04 · Responsibility

Name every handover owner

Set who measures, who approves drawings, who imports, who receives the goods and who signs off installation in Vietnam. This keeps a factory quotation comparable with a local joinery scope.

Photographed delivered homes

See kitchens and rooms in real homes

Review delivered residences to discuss kitchens, wardrobes, vanities and storage before confirming the Vietnam scope.

Light-toned alfresco kitchen island under a white terrace canopy with veined stone waterfall top, sink, cooktop, and dining
outdoor kitchen

Alfresco Kitchen Island Under a Terrace Canopy with Integrated Sink and Cooktop

Real Home case study
L-shaped brushed stainless steel outdoor kitchen on brick pavers beside a white garden pergola with built-in 5-burner grill
outdoor kitchen

L-Shaped Outdoor Kitchen with Built-In 5-Burner Grill and Prep Wing by a Garden Pergola

Real Home case study
Matte graphite outdoor kitchen on a wood deck with a brushed steel countertop, recessed outdoor sink, and spring pull-out faucet
outdoor kitchen

Outdoor Kitchen with Stainless Sink and Pull-Out Faucet on a Wood Deck

Real Home case study
Laundry cabinet with an integrated sink beside a stacked washer and dryer
balcony & laundry · living room

Laundry Cabinet with Sink and Oak-Tone Storage Wall in a Foshan Home

Real Home case study
Vietnam project sequence

From room schedule to factory release

The sequence keeps local decisions, factory engineering and shipment assumptions visible.

  1. Step 01

    Step 1 — Qualify the brief

    Share the city, property type, rooms, drawings, appliances, target date and whether you are the owner, designer, builder or developer.

  2. Step 02

    Step 2 — Confirm the route

    Record site access, lifts, corridors, loading rules, service risers and the receiving team in Vietnam.

  3. Step 03

    Step 3 — Fix the room schedule

    Confirm kitchens, wardrobes, vanities and outdoor kitchens, appliance openings, ventilation, drainage, finish codes and maintenance clearances.

  4. Step 04

    Step 4 — Approve scope and import

    Separate factory production, packing, freight, customs, local measurement and installation. Confirm every exclusion in the quotation.

  5. Step 05

    Step 5 — Release production

    Sign off scope, drawings, finishes and deposit. Allow 45–60 days for standard production, with custom timing and ocean transit confirmed separately.

Who sends the brief

Three Vietnam buying situations

The first conversation changes with the property, purchasing role and local team.

Vietnam luxury homeowner

A private humid coastal villa or apartment needing a coordinated kitchen, storage and a clear receiving plan.

  • Room and appliance schedule
  • Finish and hardware decision set
  • Access and handover plan

Vietnam architect or interior designer

A project brief that carries kitchens, wardrobes, vanities and outdoor kitchens through one material language while local services remain documented.

  • Metric production drawings
  • Finish and interface schedule
  • Factory and local responsibility map

Vietnam developer or procurement team

A repeatable room programme that needs factory capacity, consistent finishes and a defined delivery route.

  • Prototype room schedule
  • Quantity and finish matrix
  • Production and shipment assumptions
Factory verification guide

Verify factory standards in China before placing a Vietnam order

Use the companion guide on verifying a cabinet factory in China for production checks, material proofs and pre-shipment inspection routines. Confirm Vietnam customs entry rules with your importer or broker, then return to this brief to assign factory production, local measurement and site coordination.

Vietnam buyer questions

Answers before the first quotation

The answers separate the factory package from local design, import and site work.

What is the cabinet body made from?

Fadior’s company standard for stainless steel cabinet bodies is 304 stainless steel. Food-grade wording is limited to the tested cabinet-body base sheet, while doors, finishes, worktops and appliances follow their own documents.

Does it suit tropical rain, coastal humidity and termite pressure?

A 304 stainless cabinet body gives a stable, cleanable base for humid zones. The project still needs ventilation, drainage, seals, clearances and a local maintenance plan.

What does the factory provide?

Fadior reviews the room schedule, drawings, bill of materials, finishes, packing and production. The importer and local trades handle customs, site measurement, services and installation under the agreed contract.

How do we plan a tight delivery route?

Measure lifts, doors, corridors, loading bays and receiving windows before production. Fadior can label and pack modules to the approved route, while the local team confirms building rules.

How long does production take?

Standard production is 45–60 days after drawing sign-off and the required deposit. Custom profiles, special finishes or large runs take longer by quotation, followed by separate freight and customs planning.

Can a local team finish the project?

Yes. The quotation should name the local party responsible for measurement, import entry, electrical and plumbing interfaces, installation, commissioning and handover.

Ready for a Vietnam project?

Send the rooms, drawings and local route

Prefer a direct message on WhatsApp?